Construction du filtre
Showing results 1 to 6 on 6 in total
The LIFE ADSORB project is testing new ways of depolluting water that comes mainly from rainwater run-off from the ring road, with occasional contributions from wastewater. The goal is to remove 95% of the mineral and organic pollution (macro and micro pollutants).
The implementation of European environmental policy is carried out through the LIFE programme, its main instrument for the environment and the protection of nature.
With an initial duration of 5 years (July 2018 - July 2023), the project has been extended to September 2025.