Construction du filtre
Showing results 1 to 4 on 4 in total
The LIFE ADSORB project is testing new ways of depolluting water that comes mainly from rainwater run-off from the ring road, with occasional contributions from wastewater. The goal is to remove 95% of the mineral and organic pollution (macro and micro pollutants).
The City of Paris carried out a sanitation works program between July 2018 and December 2020 in the northeastern part of the Bois de Boulogne. The objective was to reduce pollutant discharges into the Seine from the Bugeaud storm overflow (SO) and to eliminate the discharge of clear water from the Saint-James pond and the Neuilly pond into the combined sewer system of the municipality of Neuilly-sur-Seine.